Tuesday, April 26, 2005

SaraBellum Building Project Details

Hi, team.
I did try to indent this Detail list, but it just won't publish that way, so without wasting too much time, here it is. I will take copies to our meeting tomorrow(Wed).
********-----------------**********-----------------------------
Project Name: Sarah Bellum Institute of Science, Engineering and Technology
Information Center
Branch/System: Sarah Bellum Institute of Science, Engineering and Technology
City: Rippon
Population: 157,000(Rippon , 2004 population statistics)
Project Information :
Location: Rippon Technology Park
Date Completed: - (fill in later)
Square Feet: 15,000sq feet.
Construction Cost: Est. $8,600,000
Project Cost: Est. $14,800,000 (exact fig. to be filled in later )
Number Of Stories/Floors: 2 (to be decided)
Planning Partnerships: Participating businesses in the Technology Park
Length Of Construction: 22 months
Project Description: (place a link to a picture of SB infor center here)
Volume Capacity: 86,500 including books, cassettes, videos and DVDs.
Multimedia Units: Included in print volumes
Reader Stations: 100+
Discussion Rooms: 5 rooms/floor
Discussion Room: Seating 50
Amphitheatre : 1
Amphitheatre Seating: 150
Computer Terminals: (Outside AT) 150+
Special Features: Donor’s wall (from the participating bodies)
Parking Space: 25
Contact Information :
Contact: Shaba
Email: shabzz@gmail.com
Telephone: 0423253677
Design Team :
Design Consultant/Manager: Aishath Shabana
General Contractor: RAPIDO Construction
Architects: Steven Bryson, Design architects, and Garcia Teague,
Executive Architects
Interiour Designer: Garcia Teague, Executive Architects
Landscape Architect: Melissa O’Brian, Landscape consultant
Acoustical Consultant: McKay Library Brook, Inc.
Signage Consultant: Office of Henry Kissinger

1 Comments:

Blogger Eric said...

Heya Shaba,

Just a thought, we might need to ramp up the number of computers available outside the seminar room due to the number of students.

I should think that we'd want to be able to accomodate a high percentage of concurant use from within the info centre. I think we should set a target percentage and go from there?

11:18 am  